Phase 1 of this 2-phase industrial project consists of a 154k sq.ft. bldg with the necessary infrastructure. Phase 2, in development, will complete the project with a 110k sq.ft. shell bldg.

PROJECT SERVICES

Conceptual Site Plans
Construction Administration
Construction Cost Analysis
Construction Site Plans
Due Diligence & Data Gathering
Landscape / Irrigation / Hardscape Plans
Lift Station Design
Permitting & Approvals
Project Coordination
Project Scheduling
Rezoning
Site Review
Traffic Impact Analysis Review

PROJECT AHJs

  • Orange County
  • Orange County Utilities (OCU)
  • Orlando Utilities Commission (OUC)
  • South Florida Water Management District (SJRWMD)
  • Florida Department of Environmental Protection (FDEP)

THE APPIAN WAY

Maintaining timely coordination with all parties involved in the permitting and construction of the project.

Achieving the desired yield and subdivision provisions while keeping in mind aesthetics and cost effectiveness.

Beachline Commerce is a two-phase industrial project located off S. John Young Parkway within unincorporated Orange County. Currently under construction, Phase 1 consists of a ±154,000 square-foot industrial shell building along with the necessary infrastructure. Phase 2 is under development and will complete the project with a second shell building, this one with an area of ±110,000 square feet.

Appian Engineering permitted a Final Engineering Plan for the initial phase of Beachline Commerce through Orange County, Orlando Utilities Commission, South Florida Water Management District, and Florida Department of Environmental Protection. Due to the nature of the project, Appian also coordinated with the project’s client/developer and architectural team extensively to ensure the final product met the expectations, as well as with the surveyor and Orange County Utilities due to existing conditions including large-diameter water, force, and storm mains present throughout the site.

We have maintained consistent progress on this project through timely and consistent coordination with the multiple permitting agencies involved. Currently, the initial phase of Beachline Commerce is under construction.

Other key tasks we accomplished during the course of this project were Master Utility and Storm Design and Engineering and Construction Administration.

Ready to get started?

Aggressive project deadlines have met their match.

Submit Project Inquiry

PAST PROJECTS

We’re proud of the opportunities we’ve had to work with some of the most respected companies, brands, and firms in the nation.